Other Eco Products
Guangzhou Longkon Eco-Tech Limited

Garbage chute

Update Time:2015-03-12 10:51:10

 

 

GARBAGE  CHUTE  
Garbage chute application
Garbage chute in general fitted internally or externally in new buildings or as replacement chutes in existing buildings. For use in high building: apartment buildings, factories, offices, shopping centres, hotels and hospitals.
 Material Specification
Longcom garbage chutes conform to USA ,China GB50235-97,UK Standards(such as BS1703,BS5906) .All chutes ex-works are manufactured to the highest quality, normally from 1.5mm stainless steel (other material and thicknesses are available). Longcom garbage chute hopper doors, have a certified 1.5 hour fire rating and smoke seal in accordance with Chinese CJ standard serial and BS476 and BS5588. 
     Advantages of Steel Compared to Concrete
Chute sections are relatively light weight and can be man handled into position. Typically a 10 storey chute can be installed in 3 to 4 days as soon as the building structure is complete and the roof is in place.
 Sizes
Supplied in circular section with internal diameters ranging from 450 to 800mm. Where possible Longcom always recommend the optimum chute size of 610mm diameter. The hopper doors supplied with this chute size suit most current user requirements in terms of capacity. In addition however Longcom offer a complete bespoke design service to provide chutes 'fit for purpose' in many shapes and sizes.
Each chute is specifically designed using the latest Auto-CAD technology to meet customer requirements and to suit the building layout. 
Generally a typical chute will comprise of two or three sections per floor connected by angle rings or a socket joint. An entry section holds the  hopper door and the chute is supported at each floor level using a special 5# angle steel and 8# U channel steel support frame.
 l Accessories
The inclusion of automatic or manual chute cleaning systems, disinfectant & sanitizing units, electrical interlocks, 
foul air exhaust fans, sound deadening and fire control equipment within the overall design can aid in meeting the needs of most client specifications. 
 l Health & Safety
Longcom chutes are designed to be safe to operate. Hopper doors are finished with rounded edges and counter-weighted for easy opening. Cut-off plates at the base of the chute are installed, where possible at a safe working height and minimize any head hazard. 
An automatic 1 or 2hr fire door located underside of the first floor of the chute is where possible always installed above head height but easily accessible for re-arming. Any electrical equipment complies with the latest chute standards and is installed and tested by qualified engineers.
Longcom provide comprehensive and job specific method statement & risk assessment documentation at the start of each project and operator manuals at time of hand-over to comply with latest concerned regulations.
 l Installation & Construction Division
Longcom provide a complete installation service including provision for re-placement of dilapidated concrete or clay pipe chutes and associated demolition and new building works.
 l Chute Maintenance & Cleaning
Generally a basic chute should be maintenance free, however where chute cleaning systems and hopper door interlocks are included,
 then Longcom will always recommend a preventative maintenance contract. In addition a chute cleaning service, utilizing high pressure jet washing equipment is available.
 

         Sizes Available -  Chutes in OD 18", 20",22", 24" , 26" 28", 30",32" (preferred shape is round)

       Doors size available -  12X15", 15x15", 15X 18", 18X18", 20x20", 24x24".  Customs sizes are also availiable
 
chute .jpgchute .jpg
Longcom Garbage Chute Description
l PART 1 – GENERAL
 
1.1 SUBMITTALS
 
A. Catalog Cuts: Before the Garbage chute is delivered to the job site, submit catalog cuts to the Architect in accordance with these specifications, 
showing all details of installation and assembly and all requirements for work by other trades.
 
B. Product Data: Manufacturer’s product specifications, standard details and recommendations for project conditions; 
indicate selected sizes and installation details specific to the project.
 
C. Shop Drawings:
1. Plans: Scale ¼ inch to 1 foot; indicate locations, dimensions, and required associated construction activities.
2. Elevations / Sections: Scale ¼ inch to 1 foot; indicate locations, dimensions, and required associated required construction activities.
3. Details: Scale ¼ inch to 1 foot; indicate:
a. Shop drawings specific to project conditions.
b. Interface with adjacent construction.
c. Dimensions and tolerances.
d. Products required for installation of the Garbage chute, but not supplied by Garbage chute manufacturer.
D. Close-out Submittals:
1. Operation and Maintenance Data:
a. Manufacturer’s printed Operational Manual.
2. Warranty Documents: Issued and executed by the manufacturer and installer of the system.
1.2 QUALITY ASSURANCE
 
A. Qualifications:
1. Manufacturer: Minimum five (5) years documented experience-producing products specified in this section.
2. Installer: Approved by the Manufacturer, and having a minimum of five (5) years experience.
 
1.3 WARRANTY
 
A. Manufacturer’s warranty: Furnish manufacturer’s standard one (1) year warranty from date of installation. 
 Warranty shall apply to defects in product workmanship and material only.
product_10_a.jpg  安装示意图1.jpg
l PART 2 – PRODUCTS
2.1PRODUCTS:
A. Acceptable manufacturer: 

B. Components:
1. The chute shall be 24” diameter of SUS304 steel as manufactured by Longcom(Guangzhou) Manufacturing.
2. Doors: 15 inches wide x 18 inches high, hand operated hopper type intake doors, self-closing, bottom hinged with 1-1/2 hour “Longcom” label; maximum 30 minute, 250° F temperature rise. 
 Stainless steel with shining finish. lever handle with keys.  Only intake door on the market with both front, back and skirt with stainless steel panels.  Better looking, longer lasting, easier cleaning, low maintenance.
3. Discharge: Open-end  “Longcom” labeled, interlocking type blades held open by fusible link assembly for automatic closing with heat around 60-80°.
4. Vent: Full diameter vent extending 3 feet above roof with hinged metal safety cap.
5. Floor Frames: Standard floor frames are 1-1/2” x 1-1/2” x 3/16” steel angles.
6. Standard Accessories: ½” sprinkler and ¾” flushing head above top intake.
  Additional ½”: sprinkler heads at alternate intake floors as required by clients and local regulation.  Furnished ONLY, for connection by others.
 
C.  Garbage Chute available upon request. Specific design requirements must be reviewed with CHUTES International prior to specifying. 
 
2.2 FABRICATION
A. The Garbage chute shall be fully factory assembled and all joints, except those required separating the sections for shipment and installation shall be welded or lock-seamed tight.  The floor intake doors shall be bolted in place on throats formed into the chute.  All chute sections shall flash inside the sections below and there shall be no bolts, clips, or other projections inside the chute to snag the flow of material.  Pre-positioned support frames shall assure proper intake levels and there shall be an expansion joint in the chute between all support joints.  Discharge offsets, where required, shall be reinforced and separately supported in the impact area.  
 
PART 3 – EXECUTION
 
3.1 EXAMINATION
 
A. Verification of conditions:
Area in which system is to be located is correct size and location, and is prepared for installation of Garbage chute and components.
 
B. Installer’s examination:
1. Have installer of this section examine conditions under which construction activities of this section are to be performed, then submit written notification if conditions under which construction activities of this section are to be performed are unacceptable.
2. Beginning construction activities of this section before unacceptable conditions have been corrected is prohibited.
3. General Contractor shall verify and record chute alignment with installer immediately following installation.
 
3.2 INSTALLATION
 
A. Install Garbage chute in accordance with shop drawings and manufacturer’s printed installation instructions.
 
3.3 DEMONSTRATION
 
A. Arrange demonstration of system operation, conducted by manufacturer’s representative, to Owner’s maintenance personnel.
                ABUIABACGAAgp4utjAUokvf26QEw8wE4mAM.jpg